Trello is a web-based, Kanban-style, list-making application and is developed by Trello Enterprise, a subsidiary of Atlassian.
Integrate your Profit.co account with Trello and help your team organize, manage and work effectively and create key results to track performance instantly.
What you can do with Profit.co – Trello KPI Integration?
With Profit.co and Trello integration, you can efficiently manage tasks by utilizing List-Based Sync to count cards and Card-Based Sync to track cards based on due dates, checklists, and due date-checklist combinations.
Configure Trello in Profit.co
Note: Only Super Users can enable the Trello integration in Profit.co
Step 1
Navigate to Settings from the left navigation panel.
Click on Integrations,Select the User Level tab and enable the Trello toggle.
Step 2
Navigate to Preference from the left navigation panel, select the Integrations tab and select the Trello Manage button to make a connection.
To establish a new connection, click on the Connect to Trello button.
Step 3
Enter the Connection name, paste the copied API key and token from the Trello account, and click on the Connect Button to discover the connection.
Step 4
Now Create a key result Using the Form in Profit.co where you want to integrate the Trello in a key result.
Note: Trello supports Percentage tracked, Increase KPI, Decrease KPI, or Control KPI type.
To integrate the key result using the increase, decrease and control KPI type,follow these steps:
Step 1
Enter the Key Result name, and choose the required Key Result type and KPI.
Select the Automate Check-ins and choose Trello from the Connection dropdown.
On the Connect to Trello tab, choose the required Connection Name, Workspace, Board, and List, and choose the required Sync Approach, you will find the Current Value.
Note:
- The List Based, Sync Approach gives you the number of cards in the selected list.
- The Card-Based Sync Approach tracks the cards in the list by considering three Tracking Types: Due Date, Checklist, and Checklist and Due Date.
- The “All Cards” option dynamically updates based on changes to the list, considering all cards present at the time of automation execution. On the other hand, “Select All” only includes the cards existing at the time of selection and does not account for later additions.
- You can also set the current value as the start value by clicking the Set as start value checkbox.
Note: Only list based approach is available in the Control KPI
Step 2
Once the Key Result is successfully created, click on the Check-in button and complete the Check-in to update the status value in the key result.
If you check-in you’ll be redirected to the review page. Finally, you can Update it to make progress to your key result.
To integrate the key result using the percentage track, follow these steps:
Step 1
Enter the Key Result name, and choose the required Key Result type and KPI.
Select the Automate Check-ins and choose Trello from the Connection dropdown.
On the Connect to Trello tab, select the required Connection Name, Workspace, Board, Sync Approach, List, and the lists to exclude from the drop-down.
Note: You have the option to exclude the list from the board using the Exclude list.you can view the Calculation click on the View Progress Calculation option.
Step 2
Once the Key Result is successfully created, click on the Check-in button and complete the Check-in to update the status value in the key result.
Note: The automatic check-in will happen every day at 09.00 AM based on the user region.